- Status Closed
- Percent Complete
- Task Type Feature Request
- Category User Interface
- Assigned To No-one
- Operating System All
- Severity Low
- Priority Very Low
- Reported Version 0.9.9.1
- Due in Version Undecided
-
Due Date
Undecided
- Votes
- Private
FS#1235 - Task ID Prefix Configurable Per Project
I noticed that "replace FS prefix" is in the TODO List for 1.0 ( FS#1174 ), so this request sort of builds on / fleshes out that task; rather, this is how I hope it will be updated.
Currently, each task ID has the FS prefix for various uses. Instead, it seems like it would be more appropriate for each task ID to have a user-specified prefix, configured on a project to project basis.
Allowing the user to configure the prefix for each project means that tasks can be identified with a specific project simply by looking at the task ID and it makes the BTS feel more personalized to the project and development team.
ID | Project | Summary | Priority | Severity | Assigned To | Progress | |
---|---|---|---|---|---|---|---|
1174 | Flyspray | Very Low | Medium |
Closed by Floele
06.04.2007 21:01
Reason for closing: Fixed in devel
Additional comments about closing:
06.04.2007 21:01
Reason for closing: Fixed in devel
Additional comments about closing:
rev 1144
Loading...
Available keyboard shortcuts
- Alt + ⇧ Shift + l Login Dialog / Logout
- Alt + ⇧ Shift + a Add new task
- Alt + ⇧ Shift + m My searches
- Alt + ⇧ Shift + t focus taskid search
Tasklist
- o open selected task
- j move cursor down
- k move cursor up
Task Details
- n Next task
- p Previous task
- Alt + ⇧ Shift + e ↵ Enter Edit this task
- Alt + ⇧ Shift + w watch task
- Alt + ⇧ Shift + y Close Task
Task Editing
- Alt + ⇧ Shift + s save task